Mytum & Selby Waste Recycling LTD – Leeds (Sherburn in Elmet), United Kingdom

Client
Mytum & Selby Waste Recycling LTD
Project Place:
Leeds (Sherburn in Elmet)
Country:
United Kingdom
Reference Sheet
System Description:
Waste Separation System
Included Components:

  • 1 Vibratory feeder system

  • 1 Feed Conveyor to Trommel Screen

    10 mtr long 1200 mm width Chevron belt

  • 1 Trommel screen 384 ; -40 / +40

  • 1 Link conveyor to picking station

    9 mtr long 1200 mm width Chevron belt

  • 1 Picking station – 4 Bay

    incl. 20,5 mtr long 1200 mm width flat belt

  • 1 Permanent overband magnet


Included:

  • Delivery, installation, commissioning, training


Control System

Overall PLC control system